Client
Confidential
Location
Fort McMurray, Alberta, Canada
Albian Sands Muskeg Oil Sands Mine
Fluor performed engineering, procurement, construction, and maintenance services for the Muskeg River oil sands mine constructed as part of the Athabasca Oil Sands project.
The project was designed to produce 155,000 barrels per day of bitumen. Production began in late 2002 and will continue for approximately 30 years.
Fluor received several awards for its role on the project, including the Shell Canada President's award for Safest Contractor.
/sitecollectionimages/projects/albian-oil-sands-epc-maintenance/muskeg-oil-sands-mine-es1250x527.jpg, Oil Sands mine - engineering
albian-oil-sands-epc-maintenance
299;#Imperial Kearl Oil Sands Phases 1 and 2;#211;#Shell Quest Carbon Capture and Storage;#55;#Shell Canada - Athabasca Oil Sands Dry Bitumen Plant;#116;#Nexen Long Lake Upgrader for Sulfur Recovery Unit - Engineering & Procurement
2;#Energy & Chemicals;#5;#Mining & Metals;#13;#Heavy Oil Upgrading & Oil Sands;#53;#Mining;#54;#Mining Process Expertise
False
1;#North America
69-131