Atacama Natural Gas Pipeline

Atacama Natural Gas Pipeline

Historic Project: Groundbreaking Work From Earlier in Fluor’s History

Client: CMS Gas Transmission and Storage

Location: Atacama Desert, Argentina and Chile


Business Segment: Energy Solutions

Industry: Fuels

Map showing the location of Atacama Natural Gas Pipeline

Executive Summary


The 20-inch, 941-kilometer Atacama Pipeline travels from Argentina to the west coast of Chile, crossing the Andes Mountains, a tropical rain forest and the driest desert in the world. We provided engineering, procurement and construction management for this project. Construction management included an early community relations program that facilitated right of way (ROW) acquisition and government approvals and allowed an accelerated schedule.

The facilities included five pig launcher/receiver sites, branch connections for future service laterals, two meter stations, 31 mainline value sites and a cathodic protection system. The pipeline project was completed in 1999.

Client's Challenge


CMS Gas Transmission and Storage Company (CMS), an affiliate of CMS Energy, a major member of the consortium of U.S., Chilean, and Argentine companies, undertook this project. CMS managed the design and construction of the project and contracted with Fluor to perform detail design, engineering, procurement and construction management.

The pipeline begins at Coronel Cornejo in the Argentine province of Salta and extends through subtropical commercial farmlands, a tropical rain forest, river valleys and severe mountain terrain in the Andes. It enters Chile at Paso de Jama and traverses the Atacama desert, which is the driest place in the world. The pipeline ends at an electrical power plant near the Pacific port of Mejillones in northern Chile. The terrain in Chile is primarily desert with underlying solid rock and areas of steep terrain.

The pipeline attains its maximum altitude in Chile, reaching an elevation of 5,000 meters (16,400 feet) above sea level. It was the highest-altitude pipeline constructed at that time.

Fluor's Solution


We provided detailed design, project engineering, procurement and construction management, which included:

  • Route selection and optimization

  • A CPS and center line survey

  • Geotechnical investigations

  • Pipeline and facilities design

  • Quality assurance inspection

  • An as-built survey

We performed the project at our offices in Tulsa, Oklahoma and Santiago, Chile.

Conclusion


We completed the Atacama Pipeline project in 1999.

Our scope of work included engineering, procurement and construction management. Fluor's construction management team initiated an early community relations program that facilitated ROW acquisition and government approvals and allowed an accelerated schedule for the pipeline.