Client
Harris Corporation Semiconductor Division
Location
Mountain Top, PA, U.S.
Harris Corporation Semiconductor Division Project Raptor
The expansion plan for Project Raptor was to construct a 140,000-square-foot standalone three-level manufacturing and central utility plant building with link connection to the existing plant. The Class 1000 ballroom fab with Class 1 minienvironments and SMIF pod interface capability is sized at approximately 26,000 square feet.
The mechanical system included the fabrication area, sub-fab and fab service areas, recirculating units, make-up air units, exhaust air systems and a fire protection system.
/SiteCollectionImages/projects/project-raptor/harris-corp-es.jpg, Harris Corporation Semiconductor Division Project Raptor
project-raptor
133;#Posco Huls Silicon Wafer Manufacturing Facility - Engineering & Construction;#60;#SilTerra Wafer Fabrication Facility;#352;#TianREC Polysilicon Plant
6;#Advanced Technologies & Life Sciences;#65;#Semiconductors
True
1;#North America
185-181