The Poinsettia platform was successfully engineered and procured by the Fluor-led Consortium, and fabricated and installed in November 2008. The platform received its first gas in December 2008 as originally promised by BG T&T. Without the innovative contracting strategy adopted by Fluor, and the dedication and determination of the experienced professionals brought to BG T&T through the Consortium, this significant achievement could not have been realized.