Projects
Skip Navigation Links Home     Projects    
Executive Summary
 
Fluor, in a joint venture with United Industrial Enterprise (UIE), performed engineering, procurement, and construction (EPC) of the FPSO process facility storage and offloading unit. The process facility includes oil/water separation, gas compression, seawater treatment, and seawater injection into the reservoir.
  • The peak oil production rate was 40,000 bpd
  • The project, executed on the basis of a demanding, fast-track schedule, was completed in just 22 months
Contact Information
For more information on this topic, please contact us. 
Careers
Learn about the exciting career challenges available at Fluor.